Grimes - Lehigh 345kV (J3926)

Grimes - Lehigh 345kV is a 170.0 MW wind interconnection project in Webster, Iowa with a current status of operational. It is proposed to connect at Grimes - Lehigh 345kV.

170.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameGrimes - Lehigh 345kV
Queue IDJ3926
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity170.0 MW
StateIowa
CountyWebster
Point of interconnectionGrimes - Lehigh 345kV
Requested (queue) date2025-03-13
Proposed in-service date2030-05-01
Operational date2030-05-01
Withdrawn date
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata