Groton-Leland Olds 345kV Line (GEN-2018-008)

Groton-Leland Olds 345kV Line is a 252.0 MW wind interconnection project in McIntosh, North Dakota with a current status of withdrawn. It is proposed to connect at Groton-Leland Olds 345kV Line.

252.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameGroton-Leland Olds 345kV Line
Queue IDGEN-2018-008
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyWind
Capacity252.0 MW
StateNorth Dakota
CountyMcIntosh
Point of interconnectionGroton-Leland Olds 345kV Line
Requested (queue) date2018-04-27
Proposed in-service date2025-06-01
Operational date
Withdrawn date2024-01-12
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata