Gulf Island Unit 2 Increase (351)
Gulf Island Unit 2 Increase is a 4.4 MW other interconnection project in Androscoggin, Maine with a current status of operational. It is proposed to connect at CMP Gulf Island 115 kV.
4.4 MWCapacity
OperationalStatus
SMEMarket
OtherTechnology
Project facts
| Canonical name | Gulf Island Unit 2 Increase |
|---|---|
| Queue ID | 351 |
| Status | operational |
| Source status | C |
| Market | SME |
| Technology | Other |
| Capacity | 4.4 MW |
| State | Maine |
| County | Androscoggin |
| Point of interconnection | CMP Gulf Island 115 kV |
| Requested (queue) date | 2010-12-03 |
| Proposed in-service date | — |
| Operational date | 2011-04-26 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata