Halfmoon Energy (0088)

Halfmoon Energy is a 500.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Rotterdam-Bear Swamp line.

500.0 MWCapacity
WithdrawnStatus
—Market
GenerationTechnology

Project facts

Canonical nameHalfmoon Energy
Queue ID0088
Statuswithdrawn
Source status0
Market—
TechnologyGeneration
Capacity500.0 MW
StateNew York
County—
Point of interconnectionRotterdam-Bear Swamp line
Requested (queue) date2001-02-26
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperTitan Development, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata