Hamilton Liberty (58420_GEN2)

Hamilton Liberty is a 435.0 MW gas interconnection project in Bradford, Pennsylvania with a current status of operational.

435.0 MWCapacity
OperationalStatus
PJMMarket
GasTechnology

Project facts

Canonical nameHamilton Liberty
Queue ID58420_GEN2
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyGas
Capacity435.0 MW
StatePennsylvania
CountyBradford
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2016-07-01
Withdrawn date
Developer
Utility / transmission ownerHamilton Liberty O&M LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata