Hamilton Liberty (58420_GEN2)

Hamilton Liberty is a 435.0 MW gas interconnection project in Bradford, Pennsylvania with a current status of operational.

435.0 MWCapacity
OperationalStatus
PJMMarket
GasTechnology

Project facts

Canonical nameHamilton Liberty
Queue ID58420_GEN2
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyGas
Capacity435.0 MW
StatePennsylvania
CountyBradford
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2016-07-01
Withdrawn date—
Developer—
Utility / transmission ownerHamilton Liberty O&M LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata