Harry Truman (6141_2)

Harry Truman is a 26.9 MW battery interconnection project in Benton, Missouri with a current status of operational.

26.9 MWCapacity
OperationalStatus
SPAMarket
BatteryTechnology

Project facts

Canonical nameHarry Truman
Queue ID6141_2
Statusoperational
Source status(OP) Operating
MarketSPA
TechnologyBattery
Capacity26.9 MW
StateMissouri
CountyBenton
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1982-08-01
Withdrawn date
Developer
Utility / transmission ownerUSCE-Kansas City District

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.