Harvest Wind Point Tap 120 kV (S1145)

Harvest Wind Point Tap 120 kV is a 100.0 MW solar+battery interconnection project in Huron, Michigan with a current status of operational. It is proposed to connect at Harvest Wind Point Tap 120 kV.

100.0 MWCapacity
OperationalStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameHarvest Wind Point Tap 120 kV
Queue IDS1145
Statusoperational
Source statusActive
Market
TechnologySolar+Battery
Capacity100.0 MW
StateMichigan
CountyHuron
Point of interconnectionHarvest Wind Point Tap 120 kV
Requested (queue) date2025-10-30
Proposed in-service date2029-07-31
Operational date2029-07-31
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.