Harvey-Underwood 230kV (J1622)

Harvey-Underwood 230kV is a 100.0 MW solar interconnection project in Sheridan, North Dakota with a current status of withdrawn. It is proposed to connect at Harvey-Underwood 230kV.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHarvey-Underwood 230kV
Queue IDJ1622
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateNorth Dakota
CountySheridan
Point of interconnectionHarvey-Underwood 230kV
Requested (queue) date2020-06-23
Proposed in-service date2024-06-01
Operational date2024-06-01
Withdrawn date2022-12-13
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.