Harwood-Siegfried 230kV II (AI1-038)

Harwood-Siegfried 230kV II is a 95.8 MW solar interconnection project in Carbon, Pennsylvania with a current status of withdrawn.

95.8 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameHarwood-Siegfried 230kV II
Queue IDAI1-038
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity95.8 MW
StatePennsylvania
CountyCarbon
Point of interconnection—
Requested (queue) date2022-04-12
Proposed in-service date2024-03-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.