HASTINGS (J3737)

HASTINGS is a 100.0 MW battery interconnection project in Mills, Iowa with a current status of withdrawn. It is proposed to connect at HASTINGS.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHASTINGS
Queue IDJ3737
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateIowa
CountyMills
Point of interconnectionHASTINGS
Requested (queue) date2024-04-18
Proposed in-service date2028-06-01
Operational date2028-06-01
Withdrawn date2025-10-24
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata