Hawkeye Solar II, LLC (70258_H2SLR)

Hawkeye Solar II, LLC is a 250.0 MW solar interconnection project in Clinton, Iowa with a current status of active.

250.0 MWCapacity
ActiveStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameHawkeye Solar II, LLC
Queue ID70258_H2SLR
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketMISO
TechnologySolar
Capacity250.0 MW
StateIowa
CountyClinton
Point of interconnection
Requested (queue) date
Proposed in-service date2028-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerHawkeye Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata