Hazleton-Mitchell County 345kV line (J1979)

Hazleton-Mitchell County 345kV line is a 200.0 MW wind interconnection project in Howard, Iowa with a current status of withdrawn. It is proposed to connect at Hazleton-Mitchell County 345kV line.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameHazleton-Mitchell County 345kV line
Queue IDJ1979
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIowa
CountyHoward
Point of interconnectionHazleton-Mitchell County 345kV line
Requested (queue) date2021-08-13
Proposed in-service date2025-10-01
Operational date2025-10-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.