Heave Solar (MPCQF-1241)

Heave Solar is a 80.0 MW solar interconnection project in Forrest County, Mississippi with a current status of operational.

80.0 MWCapacity
OperationalStatus
MSMarket
SolarTechnology

Project facts

Canonical nameHeave Solar
Queue IDMPCQF-1241
Statusoperational
Source status
MarketMS
TechnologySolar
Capacity80.0 MW
StateMississippi
CountyForrest County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata