Helix Ravenswood I (0672)

Helix Ravenswood I is a 30.2 MW gas interconnection project in Ny, New York with a current status of withdrawn. It is proposed to connect at Rainey Substation 345kV.

30.2 MWCapacity
WithdrawnStatus
JMarket
GasTechnology

Project facts

Canonical nameHelix Ravenswood I
Queue ID0672
Statuswithdrawn
Source status0
MarketJ
TechnologyGas
Capacity30.2 MW
StateNew York
CountyNy
Point of interconnectionRainey Substation 345kV
Requested (queue) date2017-10-06
Proposed in-service date2018-09-30
Operational date
Withdrawn date
DeveloperLS Power Development, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata