Helmer (0946)

Helmer is a 21.3 MW battery interconnection project in Herkimer, New York with a current status of withdrawn. It is proposed to connect at Old Forge - Raquette Lake 46 kV.

21.3 MWCapacity
WithdrawnStatus
EMarket
BatteryTechnology

Project facts

Canonical nameHelmer
Queue ID0946
Statuswithdrawn
Source status0
MarketE
TechnologyBattery
Capacity21.3 MW
StateNew York
CountyHerkimer
Point of interconnectionOld Forge - Raquette Lake 46 kV
Requested (queue) date2019-11-14
Proposed in-service date2020-01-31
Operational date
Withdrawn date
DeveloperDimension NY 1 LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata