HF Sinclair Puget Sound Refining (54268_GTG3)

HF Sinclair Puget Sound Refining is a 46.6 MW gas interconnection project in Skagit, Washington with a current status of operational.

46.6 MWCapacity
OperationalStatus
PSEIMarket
GasTechnology

Project facts

Canonical nameHF Sinclair Puget Sound Refining
Queue ID54268_GTG3
Statusoperational
Source status(OP) Operating
MarketPSEI
TechnologyGas
Capacity46.6 MW
StateWashington
CountySkagit
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1993-01-01
Withdrawn date
Developer
Utility / transmission ownerHF Sinclair Parco Refining LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.