Hickok 115kV Sub (GEN-2014-045)

Hickok 115kV Sub is a 50.0 MW solar interconnection project in Grant, Kansas with a current status of withdrawn. It is proposed to connect at Hickok 115kV Sub.

50.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameHickok 115kV Sub
Queue IDGEN-2014-045
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity50.0 MW
StateKansas
CountyGrant
Point of interconnectionHickok 115kV Sub
Requested (queue) date2014-09-29
Proposed in-service date
Operational date
Withdrawn date2014-11-06
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.