Highland - Raun 345kV Line Tap (J748)

Highland - Raun 345kV Line Tap is a 200.0 MW wind interconnection project in Plymouth County, Iowa with a current status of operational. It is proposed to connect at Highland - Raun 345kV Line Tap.

200.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameHighland - Raun 345kV Line Tap
Queue IDJ748
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity200.0 MW
StateIowa
CountyPlymouth County
Point of interconnectionHighland - Raun 345kV Line Tap
Requested (queue) date2016-11-14
Proposed in-service date2020-10-01
Operational date2020-10-01
Withdrawn date
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata