Hisel 230 kV Substation (GEN-2021-097)

Hisel 230 kV Substation is a 300.0 MW wind interconnection project in Elida, New Mexico with a current status of withdrawn. It is proposed to connect at Hisel 230 kV Substation.

300.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameHisel 230 kV Substation
Queue IDGEN-2021-097
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyWind
Capacity300.0 MW
StateNew Mexico
CountyElida
Point of interconnectionHisel 230 kV Substation
Requested (queue) date2021-05-24
Proposed in-service date2026-12-31
Operational date
Withdrawn date2023-07-14
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.