Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV (GEN-2010-001)

Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV is a 300.0 MW wind interconnection project in Beaver County, Oklahoma with a current status of operational. It is proposed to connect at Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV.

300.0 MWCapacity
OperationalStatus
OKMarket
WindTechnology

Project facts

Canonical nameHitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV
Queue IDGEN-2010-001
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketOK
TechnologyWind
Capacity300.0 MW
StateOklahoma
CountyBeaver County
Point of interconnectionHitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV
Requested (queue) date2010-03-03
Proposed in-service date
Operational date2012-01-01
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata