HJ73SB Project (LG-21-9-4)

HJ73SB Project is a 73.0 MW solar+battery interconnection project in Dona Ana, New Mexico with a current status of withdrawn. It is proposed to connect at Hatch-Jornada 115 kV.

73.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameHJ73SB Project
Queue IDLG-21-9-4
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity73.0 MW
StateNew Mexico
CountyDona Ana
Point of interconnectionHatch-Jornada 115 kV
Requested (queue) date2021-09-30
Proposed in-service date2024-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata