HO100SB Project is a 100.0 MW solar+battery interconnection project in Otero, New Mexico with a current status of withdrawn. It is proposed to connect at Holloman substation.

100.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameHO100SB Project
Queue IDLG-19-9-30
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity100.0 MW
StateNew Mexico
CountyOtero
Point of interconnectionHolloman substation
Requested (queue) date2019-09-30
Proposed in-service date2022-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata