Hobb-Millen 115kV (GEN-2019-022)

Hobb-Millen 115kV is a 41.0 MW solar interconnection project in Hobbs, Lea, New Mexico with a current status of withdrawn. It is proposed to connect at Hobb-Millen 115kV.

41.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameHobb-Millen 115kV
Queue IDGEN-2019-022
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity41.0 MW
StateNew Mexico
CountyHobbs, Lea
Point of interconnectionHobb-Millen 115kV
Requested (queue) date2019-04-24
Proposed in-service date2024-12-22
Operational date
Withdrawn date2022-11-10
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata