Hobbs 230kV / 115kV Switchyard (GEN-2019-004)

Hobbs 230kV / 115kV Switchyard is a 56.0 MW other interconnection project in Hobbs, New Mexico with a current status of withdrawn. It is proposed to connect at Hobbs 230kV / 115kV Switchyard.

56.0 MWCapacity
WithdrawnStatus
NMMarket
OtherTechnology

Project facts

Canonical nameHobbs 230kV / 115kV Switchyard
Queue IDGEN-2019-004
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyOther
Capacity56.0 MW
StateNew Mexico
CountyHobbs
Point of interconnectionHobbs 230kV / 115kV Switchyard
Requested (queue) date2019-04-22
Proposed in-service date2019-06-04
Operational date
Withdrawn date2023-10-16
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata