Hobbs 230kV (GEN-2009-038)

Hobbs 230kV is a 99.0 MW wind interconnection project in Hobbs, New Mexico with a current status of withdrawn. It is proposed to connect at Hobbs 230kV.

99.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameHobbs 230kV
Queue IDGEN-2009-038
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyWind
Capacity99.0 MW
StateNew Mexico
CountyHobbs
Point of interconnectionHobbs 230kV
Requested (queue) date2009-08-27
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata