Hobbs 230kV Substation (GEN-2017-104)

Hobbs 230kV Substation is a 240.0 MW solar interconnection project in Lea County, New Mexico with a current status of withdrawn. It is proposed to connect at Hobbs 230kV Substation.

240.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameHobbs 230kV Substation
Queue IDGEN-2017-104
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity240.0 MW
StateNew Mexico
CountyLea County
Point of interconnectionHobbs 230kV Substation
Requested (queue) date2017-06-19
Proposed in-service date
Operational date
Withdrawn date2021-06-07
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.