Hobbs - Yoakum 345 kV Line (GEN-2024-366)
Hobbs - Yoakum 345 kV Line is a 200.0 MW wind interconnection project in Lea, New Mexico with a current status of withdrawn. It is proposed to connect at Hobbs - Yoakum 345 kV Line.
200.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology
Project facts
| Canonical name | Hobbs - Yoakum 345 kV Line |
|---|---|
| Queue ID | GEN-2024-366 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | NM |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | New Mexico |
| County | Lea |
| Point of interconnection | Hobbs - Yoakum 345 kV Line |
| Requested (queue) date | 2025-03-01 |
| Proposed in-service date | 2030-06-30 |
| Operational date | — |
| Withdrawn date | 2026-05-21 |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata