Hobbs - Yoakum 345 kV (GEN-2023-236)

Hobbs - Yoakum 345 kV is a 400.0 MW solar interconnection project in Lea, New Mexico with a current status of withdrawn. It is proposed to connect at Hobbs - Yoakum 345 kV.

400.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameHobbs - Yoakum 345 kV
Queue IDGEN-2023-236
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity400.0 MW
StateNew Mexico
CountyLea
Point of interconnectionHobbs - Yoakum 345 kV
Requested (queue) date2023-10-02
Proposed in-service date2030-12-31
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata