Holcomb 115kV substation (GEN-2019-014)

Holcomb 115kV substation is a 125.0 MW solar interconnection project in Finney, Kansas with a current status of withdrawn. It is proposed to connect at Holcomb 115kV substation.

125.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameHolcomb 115kV substation
Queue IDGEN-2019-014
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity125.0 MW
StateKansas
CountyFinney
Point of interconnectionHolcomb 115kV substation
Requested (queue) date2019-04-24
Proposed in-service date2025-12-01
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata