Holcomb - Sidney 345 kV Line (GEN-2024-108)

Holcomb - Sidney 345 kV Line is a 301.5 MW wind interconnection project in Scott, Kansas with a current status of withdrawn. It is proposed to connect at Holcomb - Sidney 345 kV Line.

301.5 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameHolcomb - Sidney 345 kV Line
Queue IDGEN-2024-108
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity301.5 MW
StateKansas
CountyScott
Point of interconnectionHolcomb - Sidney 345 kV Line
Requested (queue) date2025-03-01
Proposed in-service date2031-12-31
Operational date
Withdrawn date2025-08-28
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata