Holcomb - Spearville 345 kV line (GEN-2024-049)

Holcomb - Spearville 345 kV line is a 199.0 MW battery interconnection project in Ford, Kansas with a current status of withdrawn. It is proposed to connect at Holcomb - Spearville 345 kV line.

199.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameHolcomb - Spearville 345 kV line
Queue IDGEN-2024-049
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity199.0 MW
StateKansas
CountyFord
Point of interconnectionHolcomb - Spearville 345 kV line
Requested (queue) date2024-10-30
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata