Hollyhock Solar (0772)

Hollyhock Solar is a 20.0 MW solar interconnection project in Albany, New York with a current status of withdrawn. It is proposed to connect at Leeds - New Scotland 115kV.

20.0 MWCapacity
WithdrawnStatus
FMarket
SolarTechnology

Project facts

Canonical nameHollyhock Solar
Queue ID0772
Statuswithdrawn
Source status0
MarketF
TechnologySolar
Capacity20.0 MW
StateNew York
CountyAlbany
Point of interconnectionLeeds - New Scotland 115kV
Requested (queue) date2018-10-15
Proposed in-service date2018-12-31
Operational date
Withdrawn date
DeveloperHollyhock Solar, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata