Homer Storage (1135)

Homer Storage is a 5.0 MW battery interconnection project in Cortland, New York with a current status of withdrawn. It is proposed to connect at Cortland - Fenner 115kV.

5.0 MWCapacity
WithdrawnStatus
CMarket
BatteryTechnology

Project facts

Canonical nameHomer Storage
Queue ID1135
Statuswithdrawn
Source status0
MarketC
TechnologyBattery
Capacity5.0 MW
StateNew York
CountyCortland
Point of interconnectionCortland - Fenner 115kV
Requested (queue) date2021-02-11
Proposed in-service date2023-09-30
Operational date
Withdrawn date
DeveloperEDF Renewables Development, Inc.
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.