Hoot Lake 115KV (R1006)

Hoot Lake 115KV is a 350.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Hoot Lake 115KV.

350.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology

Project facts

Canonical nameHoot Lake 115KV
Queue IDR1006
Statusoperational
Source statusWithdrawn
Market—
TechnologyGeneration
Capacity350.0 MW
State—
CountyLima
Point of interconnectionHoot Lake 115KV
Requested (queue) date2021-02-15
Proposed in-service date2023-07-01
Operational date2023-07-01
Withdrawn date—
Developer—
Utility / transmission ownerAlliant Energy West

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.