Hopkins Ridge Addition (G0274)

Hopkins Ridge Addition is a 7.0 MW wind interconnection project in Columbia, Washington with a current status of operational. It is proposed to connect at Tucannon River Switching Station.

7.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology

Project facts

Canonical nameHopkins Ridge Addition
Queue IDG0274
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyWind
Capacity7.0 MW
StateWashington
CountyColumbia
Point of interconnectionTucannon River Switching Station
Requested (queue) date2007-06-29
Proposed in-service date
Operational date2008-08-01
Withdrawn date
DeveloperPuget Sound Energy
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata