Hopkins Ridge Wind (G100)

Hopkins Ridge Wind is a 150.0 MW wind interconnection project in Columbia, Washington with a current status of operational. It is proposed to connect at At BPA Tucannon River 115 kV Substation on N. Lewiston - Walla Walla line.

150.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology

Project facts

Canonical nameHopkins Ridge Wind
Queue IDG100
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyWind
Capacity150.0 MW
StateWashington
CountyColumbia
Point of interconnectionAt BPA Tucannon River 115 kV Substation on N. Lewiston - Walla Walla line
Requested (queue) date2002-05-07
Proposed in-service date
Operational date2003-12-01
Withdrawn date
DeveloperPuget Sound Energy
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.