Horn Rapids Solar Project (G0518)

Horn Rapids Solar Project is a 5.0 MW solar interconnection project in Benton, Washington with a current status of operational. It is proposed to connect at Pole 3401, City of Richland.

5.0 MWCapacity
OperationalStatus
WAMarket
SolarTechnology

Project facts

Canonical nameHorn Rapids Solar Project
Queue IDG0518
Statusoperational
Source statusENERGIZED
MarketWA
TechnologySolar
Capacity5.0 MW
StateWashington
CountyBenton
Point of interconnectionPole 3401, City of Richland
Requested (queue) date2015-11-13
Proposed in-service date
Operational date2017-11-13
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata