Horn Rapids Solar Project (G0518)
Horn Rapids Solar Project is a 5.0 MW solar interconnection project in Benton, Washington with a current status of operational. It is proposed to connect at Pole 3401, City of Richland.
5.0 MWCapacity
OperationalStatus
WAMarket
SolarTechnology
Project facts
| Canonical name | Horn Rapids Solar Project |
|---|---|
| Queue ID | G0518 |
| Status | operational |
| Source status | ENERGIZED |
| Market | WA |
| Technology | Solar |
| Capacity | 5.0 MW |
| State | Washington |
| County | Benton |
| Point of interconnection | Pole 3401, City of Richland |
| Requested (queue) date | 2015-11-13 |
| Proposed in-service date | — |
| Operational date | 2017-11-13 |
| Withdrawn date | — |
| Developer | Energy Efficiency Solar, Inc. dba ACRO Energy Inc. |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata