Horn Rapids Solar, Storage and Training (64198_HRBE)

Horn Rapids Solar, Storage and Training is a 1.0 MW battery interconnection project in Benton, Washington with a current status of operational.

1.0 MWCapacity
OperationalStatus
BPATMarket
BatteryTechnology

Project facts

Canonical nameHorn Rapids Solar, Storage and Training
Queue ID64198_HRBE
Statusoperational
Source status(OP) Operating
MarketBPAT
TechnologyBattery
Capacity1.0 MW
StateWashington
CountyBenton
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-12-01
Withdrawn date
Developer
Utility / transmission ownerEnergy Northwest

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.