Horry Land Fill Gas Site is a 1.4 MW gas interconnection project in Horry, South Carolina with a current status of operational.

1.4 MWCapacity
OperationalStatus
SCMarket
GasTechnology

Project facts

Canonical nameHorry Land Fill Gas Site
Queue ID7958_HG2
Statusoperational
Source status(OP) Operating
MarketSC
TechnologyGas
Capacity1.4 MW
StateSouth Carolina
CountyHorry
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2001-08-01
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata