Horseshoe Lake 138kV Substation (ERAS-2025-010)
Horseshoe Lake 138kV Substation is a 496.0 MW gas interconnection project in Harrah, Oklahoma with a current status of active. It is proposed to connect at Horseshoe Lake 138kV Substation.
496.0 MWCapacity
ActiveStatus
OKMarket
GasTechnology
Project facts
| Canonical name | Horseshoe Lake 138kV Substation |
|---|---|
| Queue ID | ERAS-2025-010 |
| Status | active |
| Source status | IA FULLY EXECUTED/ON SCHEDULE |
| Market | OK |
| Technology | Gas |
| Capacity | 496.0 MW |
| State | Oklahoma |
| County | Harrah |
| Point of interconnection | Horseshoe Lake 138kV Substation |
| Requested (queue) date | 2025-09-10 |
| Proposed in-service date | 2029-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | OGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-24 | operational_date | 2028-04-01 | — | medium |
| 2026-09-24 | proposed_online_date | — | 2029-01-01 | medium |
| 2026-09-24 | status | operational | active | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata