Huard Road (L0467)
Huard Road is a 10.2 MW other interconnection project in Benton, Washington with a current status of active. It is proposed to connect at Prosser Tap on the Grandview-Red Mountain 115 kV line.
10.2 MWCapacity
ActiveStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Huard Road |
|---|---|
| Queue ID | L0467 |
| Status | active |
| Source status | CONST AGRMT EXE |
| Market | WA |
| Technology | Other |
| Capacity | 10.2 MW |
| State | Washington |
| County | Benton |
| Point of interconnection | Prosser Tap on the Grandview-Red Mountain 115 kV line |
| Requested (queue) date | 2019-09-18 |
| Proposed in-service date | 2021-08-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Benton Rural Electric Association |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata