Huckleberry Ridge Energy (0745)

Huckleberry Ridge Energy is a 100.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Shoemaker-Westtown 69kV line #11 and Shoemaker to Deerpark 69 kV #14.

100.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameHuckleberry Ridge Energy
Queue ID0745
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyOrange
Point of interconnectionShoemaker-Westtown 69kV line #11 and Shoemaker to Deerpark 69 kV #14
Requested (queue) date2018-07-25
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerO&R

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.