Hudson Energy Storage (1622)

Hudson Energy Storage is a 200.0 MW battery interconnection project in Greene, New York with a current status of withdrawn. It is proposed to connect at 345kV Leeds Substation.

200.0 MWCapacity
WithdrawnStatus
FMarket
BatteryTechnology

Project facts

Canonical nameHudson Energy Storage
Queue ID1622
Statuswithdrawn
Source status0
MarketF
TechnologyBattery
Capacity200.0 MW
StateNew York
CountyGreene
Point of interconnection345kV Leeds Substation
Requested (queue) date2023-10-17
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperBPUS Generation Development LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.