Hudson Valley Storage (1067)

Hudson Valley Storage is a 20.0 MW battery interconnection project in Ulster, New York with a current status of withdrawn. It is proposed to connect at E Kingston Substation .

20.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameHudson Valley Storage
Queue ID1067
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyUlster
Point of interconnectionE Kingston Substation
Requested (queue) date2020-08-05
Proposed in-service date2020-10-31
Operational date
Withdrawn date
DeveloperViridity Energy Solutions, Inc.
Utility / transmission ownerCHGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata