Huntington Falls 2017 Upgrades (606)

Huntington Falls 2017 Upgrades is a 1.6 MW other interconnection project in Chittenden, Vermont with a current status of operational. It is proposed to connect at GMP Huntington Falls Substation 46 kV Circuit Breaker BB-10.

1.6 MWCapacity
OperationalStatus
VTMarket
OtherTechnology

Project facts

Canonical nameHuntington Falls 2017 Upgrades
Queue ID606
Statusoperational
Source statusC
MarketVT
TechnologyOther
Capacity1.6 MW
StateVermont
CountyChittenden
Point of interconnectionGMP Huntington Falls Substation 46 kV Circuit Breaker BB-10
Requested (queue) date2016-04-21
Proposed in-service date
Operational date2017-04-12
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata