Hunton Creek 230 Switching Station (GI-DISIS-2021-10)

Hunton Creek 230 Switching Station is a 199.0 MW solar interconnection project in Converse County, Wyoming with a current status of withdrawn. It is proposed to connect at Hunton Creek 230 Switching Station.

199.0 MWCapacity
WithdrawnStatus
WYMarket
SolarTechnology

Project facts

Canonical nameHunton Creek 230 Switching Station
Queue IDGI-DISIS-2021-10
Statuswithdrawn
Source statusWITHDRAWN
MarketWY
TechnologySolar
Capacity199.0 MW
StateWyoming
CountyConverse County
Point of interconnectionHunton Creek 230 Switching Station
Requested (queue) date2021-05-28
Proposed in-service date2028-01-05
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-01statusactivewithdrawnhigh
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata