Huntwoods 69 kV substation (J1135) (J1478)

Huntwoods 69 kV substation (J1135) is a 25.0 MW battery interconnection project in Des Moines County, Iowa with a current status of withdrawn. It is proposed to connect at Huntwoods 69 kV substation (J1135).

25.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHuntwoods 69 kV substation (J1135)
Queue IDJ1478
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity25.0 MW
StateIowa
CountyDes Moines County
Point of interconnectionHuntwoods 69 kV substation (J1135)
Requested (queue) date2019-04-29
Proposed in-service date2021-10-01
Operational date2021-10-01
Withdrawn date2022-02-18
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata