HVDC/AC Tie - Import only (519)

HVDC/AC Tie - Import only is a 1,200.0 MW generation interconnection project in Rockingham, New Hampshire with a current status of withdrawn. It is proposed to connect at HQ Des Cantons substation to PSNH Deerfield substation.

1,200.0 MWCapacity
WithdrawnStatus
NHMarket
GenerationTechnology

Project facts

Canonical nameHVDC/AC Tie - Import only
Queue ID519
Statuswithdrawn
Source statusW
MarketNH
TechnologyGeneration
Capacity1,200.0 MW
StateNew Hampshire
CountyRockingham
Point of interconnectionHQ Des Cantons substation to PSNH Deerfield substation
Requested (queue) date2015-02-16
Proposed in-service date2019-04-30
Operational date
Withdrawn date2015-08-18
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata