HVDC Tie - Import only (505)

HVDC Tie - Import only is a 1,000.0 MW generation interconnection project in Windsor, Vermont with a current status of withdrawn. It is proposed to connect at HQ to VELCO 345 kV Coolidge substation.

1,000.0 MWCapacity
WithdrawnStatus
VTMarket
GenerationTechnology

Project facts

Canonical nameHVDC Tie - Import only
Queue ID505
Statuswithdrawn
Source statusW
MarketVT
TechnologyGeneration
Capacity1,000.0 MW
StateVermont
CountyWindsor
Point of interconnectionHQ to VELCO 345 kV Coolidge substation
Requested (queue) date2015-02-16
Proposed in-service date2017-12-31
Operational date
Withdrawn date2015-04-17
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata