Hwy 228-Bennsville 69 kV (AF1-004)

Hwy 228-Bennsville 69 kV is a 16.8 MW solar interconnection project in Charles, Maryland with a current status of withdrawn.

16.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHwy 228-Bennsville 69 kV
Queue IDAF1-004
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity16.8 MW
StateMaryland
CountyCharles
Point of interconnection
Requested (queue) date2019-04-01
Proposed in-service date2021-04-30
Operational date
Withdrawn date2020-10-08
Developer
Utility / transmission ownerSMECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.